Audit Reports
Odisha
Report No.2 of 2018 - General and Social Sector Government of Odisha
Overview
In Pradhan Mantri Gram Sadak Yojana, road connectivity to 33 per cent had not been given even after 16 years of implementation of the programme.
In National Cyclone Risk Mitigation Project and Odisha Disaster Recovery Project in the State, Odisha State Disaster Management Authority had not implemented the projects under NCRMP and ODRP efficiently despite utilising ` 1,432.76 crore as of March 2017.
Information Technology Audit on Works and Accounting Management Information System (WAMIS) revealed that the objective of implementing WAMIS was not achieved due to non-implementation of all modules.
Implementation of National Rural Drinking Water Programme was not effective and the vision of providing safe drinking water for all at all times could not be achieved.
Download Audit Report
-
Index (0.02 MB) Download
-
Preface (0.00 MB) Download
-
Chapter 1 Introduction (0.06 MB) Download
-
Chapter 2 Performance Audit (1.34 MB) Download
-
Chapter 3 Compliance Audit (0.57 MB) Download
-
Appendix (0.41 MB) Download
-
Glossary (0.04 MB) Download