APPENDIX - XXX

(Referred to in paragraph 41.3 at page 116)

Loading and unloading charges

S.
No.

Year

Facilities available (such as crane/ forklift etc.) at CTSDs/ Telecom units

Amount paid to the contractor for loading and unloading (Rs in lakh)

Remarks

1

1995-96

Forklift

14.02

1. In NE circle Guwahati CTSD NE Circle) one forklift-5 ton was in working position upto 19.4.1999 and thereafter went out of order.
2. In Assam, CTSD Guwahati, one forklift was out of order since 1994-95.
3. In Orissa circle loading/unloading was paid when for lift driver was absent and forklift was out of order.
4. In West Bengal Circle (CTSD, Siliguri) and CGM (CTD), Kolkata loading/ unloading was paid in working position of the forklift.

2

1996-97

-do-

17.07

3

1997-98

-do-

20.08

4

1998-99

-do-

28.26

5

1999-00

-do-

26.92

 

Total

 

106.35